SCPC / RESOURCES
Technical resources
Clear answers to common construction assurance questions.
RESOURCES / PCC
Professional Consultants Certificates
What is a Professional Consultants Certificate?
A PCC is professional certification relating to construction following an agreed technical review and inspection scope. It is not an insurance policy.
PCC or structural warranty?
A PCC is professional certification. A structural warranty is an insurance-backed product. Acceptance depends on the lender, purchaser and project circumstances.
When should SCPC be appointed?
As early as possible—ideally before construction—so the information and inspection strategy can be agreed while important work remains visible.
What information is normally needed?
Project address, construction type, drawings, structural information, approvals, specifications, programme, number of units and current stage.
RESOURCES / MMC
MMC and off-site construction
What is BOPAS?
BOPAS is an independent assurance process associated with durability and mortgageability of non-traditional construction. SCPC can support evidence and audit preparation but does not award accreditation.
What are Modern Methods of Construction?
MMC covers manufacturing-led and innovative construction approaches. Assessment must still consider the completed building from design through site interfaces.
Why does factory quality assurance matter?
Design evidence supports the finished building only when materials, workmanship, inspections, traceability and non-conformances are controlled consistently.
How do Building Regulations apply to MMC?
MMC does not sit outside the Building Regulations. Project teams need coordinated evidence for the completed building.
RESOURCES / INSPECTION
Inspection and evidence
What inspections are required?
The strategy depends on project size, complexity, construction type, risk and current stage. Important concealed work should be inspected before it is covered.
Does an inspection guarantee every element?
No. A professional inspection is sample-based and limited to work visible and accessible at the time. Contractors remain responsible for workmanship and quality control.
What makes a useful completion record?
Coordinated as-built drawings, test and commissioning records, certificates, inspection evidence, resolved actions and relevant operation and maintenance information.
START A CONVERSATION
Need independent advice on a construction project?
Tell SCPC what you are planning, where the project is and its current stage. You will receive a clear response on suitability and next steps.
